top of page

Final conceptual work

Kick-Off

Workshop

Define common target and way of realization for the study planning phase.

First

Concepts

Initial ideas based on Kick-Off for further iteration discussion.

Intermediate

Presentation

Common Target Definition for final study phgase

Downselection

Phase

Technical specification of production line for public bidding

Final

Results

Presentation of planning study and documentation of results

Assist supplier

downselect

Selection based on customer requirements (Technology, Costs, ...)

Content:
​
  1. Production capacity

  2. Process flow design

  3. Design of production  stations

  4. Production layout

  5. Automatic machining equipment selection

  6. Quality control plan

  7. Production logistic and material flow plan

  8. Information management system design concept

  9. Component requirement

  10. Tooling design modeling

  11. 3D model of facility & equipment 

  12. Ergonomic design and comfortable operation environment

  13. Cycle time calculation, simulation and/or animation

  14. Construction cost budget estimation

First concepts and preliminary calculations to define final work
bottom of page